CNC flame cutting machine cutting mouth supplies application knowledge entry

Large-scale CNC machine tools such as CNC flame cutting machine daily maintenance work, the more important point is that the use of cutting mouth supplies maintenance problems, good operators for CNC flame cutting machine cutting mouth supplies have some unique insights and skills , Not only to help enterprises in the bulk cutting process to reduce the use of equipment costs, but also to protect the machine tool cutting quality and effectiveness.
So for the NC flame cutting machine cutting mouth use, there are those who deserve the attention of enterprises and operators of the place? We believe that in the use of the process, taking into account the NC flame cutting machine used in the plate processing shop, the maintenance of workers is not enough, the machine life will have an impact, especially as a consumable flame cutting machine cutting mouth, Its maintenance and use is difficult to place, resulting in cutting mouth loss is too large. From the cutting principle, the cutting of the mouth of the flame to obtain high-precision cutting of a very important part of the cutting, the operation of the correct or not will determine the extent of the final cutting effect. The following are the same as the "
CNC flame cutting machine cutting with a large thickness of carbon steel cutting capacity, because of its cutting workpiece thickness, cutting surface vertical, coupled with the advantages of low cutting costs, has been CNC cutting equipment than customers popular cutting method. In the daily processing and use, for cutting the mouth to use its related knowledge and precautions, including cutting the mouth of the selection, daily cleaning and maintenance, cutting height control and other aspects, for the convenience of everyone to understand, the following we will specify one by one:
1. Note that cutting mouth cleaning and maintenance
CNC flame cutting machine cutting mouth is also easy to damage the equipment parts of one of the supplies. Therefore, the CNC cutting cut mouth to do the appropriate cleaning and maintenance, not only can improve the efficiency of CNC cutting machine to ensure the quality of its cutting, but also to extend the life of CNC flame cutting machine. Thereby reducing production costs.
2. Timely to clear the mouth to prevent clogging
In the process of cutting the CNC flame cutting machine, the slag splashing in the high heat state is easy to plug the cut mouth, so the cutting and maintenance of the cutting mouth is very important. When cutting the cut mouth, turn off the preheat oxygen hand valve; press the cut oxygen button to open the cutting oxygen solenoid valve; turn off the cutting torch on the torch so that the nozzle can be inserted into the nozzle, In the fast oxygen hole twitching up and down, and slowly open the torch to cut the oxygen hand valve.
3. Cutting tip height control
Set the appropriate spacing between the cutting and cutting of the CNC flame cutting machine. CNC flame cutting machine without automatic increase, the operator should always pay attention to the distance between the cutting nozzle from the workpiece. When the top of the primary flame (flame core) is about 1 mm on the workpiece, it is the ideal spacing of the cut mouth. Also need to be adjusted according to the use of cutting gas appropriate cut mouth height, such as with acetylene from 3 to 10mm, with other gas from 6 to 12mm. On the other hand, if the steel plate deformation or uneven should also be adjusted. When using propane or natural gas as the gas, cutting the thickness to 50mm, the cut mouth height should be doubled.
4. cut mouth selection
Select the appropriate CNC flame cutting machine cutting mouth model. Chopper type selection need to be based on the use of gas and cutting materials and thickness to consider, this we have in the previous technical articles have also been listed in detail, no longer tired in this.

Installation of the measurement: oxygen - acetylene flame cutting concept and content

Oxygen-acetylene flame maximum temperature of up to 3300 ° C, the metal surface heating faster. Using different specifications of the torch and cut mouth, you can cut different thickness of low carbon steel, medium carbon steel and low alloy steel. Oxygen-acetylene flame cutting is a traditional cutting method, the application of a wide range, usually cut the thickness of the range of 3 ~ 150mm. Oxygen-acetylene flame cutting is gradually replaced by oxygen-propane flame cutting due to poor safety, serious environmental pollution and high cost of acetylene gas production.

Regulations on Municipal Road Safety Supervision

The safety of the municipal road construction project is related to the life and property safety of the people, and is related to the social stability and the sustained and healthy development of the national economy. Municipal road construction projects involve a large number of subjects, the activities of the parties and the safety of the construction are closely related. Therefore, in the safety management, we must adhere to the "safety first, prevention first" approach. At the same time must implement the "tube production must be safe" principle, the implementation of responsibility, the formation of interaction. To plan, arrange, inspect, summarize and evaluate the production at the same time, planning, layout, inspection, summary and appraisal of safe work. To do a good job of safe work, in fact, to achieve safe production. The safety responsibility of construction supervision is to conscientiously implement the policy of safe production and urge the construction unit to organize construction according to the construction safety production laws, regulations and standards, eliminate the risk, blindness and randomness in construction, implement the safety production responsibility system and the Safety and technical measures to effectively eliminate all kinds of security risks, eliminate, control and reduce all kinds of casualties, to achieve safe production. In accordance with the requirements of the Safety Production Regulations, the safety supervision rules shall be formulated in accordance with the characteristics of the road construction supervision and the safety responsibility for safety.
First, the construction preparation stage safety supervision control points
1, urging the construction unit to establish and improve the production safety guarantee system, the establishment of safety management agencies, with full-time safety management personnel. Examine the qualifications of full-time security officers, assess their practical ability to ensure that the construction unit of the security system to normal operation;
2, urging the construction unit to develop safety management system, the security inspection system regular, institutionalized and standardized.
3, review the construction organization design, security control points:
① In the organization of safety management, quality management and safety assurance system, it is determined that the project manager is the first person responsible for the safe production of the construction tenders. The captain and the team leader are also responsible for the safety of the team and work class
②, review the number of special types of workers and the safety of the qualifications, training certificates of posts;
③, review the safety production responsibility system, safety production management system, safety operation rules of the development of the situation;
④, review the lifting machinery and equipment, construction machinery and electrical equipment and other settings meet the regulatory requirements;
⑤ Whether the storage, management and use of civil explosive materials comply with the provisions of the Regulations on the Administration of Civil Explosives;
⑥, the development of emergency rescue plan;
⑦, winter, rainy season, high temperature season and other seasonal construction program development;
⑧, the construction of the general plan is reasonable, office, dormitory, canteens and other temporary facilities and construction site site, roads, sewage, drainage, fire safety measures meet the safety standards, norms and civilized construction requirements;
⑨, sidewalk and the construction of the station is consistent with the Danyang City Urban Construction Traffic Key Project Headquarters requirements;
⑩, temporary electricity is in line with the "construction site temporary safety technical requirements" requirements.
4, to review the investment in security measures can guarantee the need for normal safety production measures;
5, check the crossing, crossroads and other places have a greater risk of the site and the facilities, equipment, whether to set a clear security warning signs to remind people to pay attention to safety;
6, urge the construction unit of safety equipment, facilities maintenance, maintenance, and testing and calibration, to ensure good safety performance. The equipment must be eliminated from the site, endanger the production of safe technology, equipment shall not be used;
7, to reach a certain size of the larger dangerous projects, such as Maoshan tunnel project should be prepared special construction program, invited experts to demonstrate, review;
8, urging the inspection of security technology to pay the work
①, the project manager must implement the level of security technology to the end of the system, the vertical extension to the team of all operating personnel;
②, technology must be specific, clear, targeted;
(3) The contents of the technology should be based on the potential implied risk factors and problems in the construction of the division;
④ should be given priority to the use of new security technology measures;
⑤, should be the project profile, construction methods, construction level, quality standards, safety and technical measures to the captain, team leader and all the operating personnel in detail;
⑥, the end must be focused: the characteristics of the operation, dangerous points and the prevention of dangerous points for the precautions, attention to safety matters, the corresponding operating procedures and standards;
⑦, written security technology at the end of the signature record complete and complete.
Second, the operation of the operation safety supervision and control points
1, the construction site temporary safety control - carefully prepared on-site temporary electricity program
①, according to the construction needs to determine the number of electrical equipment and installed capacity;
② to determine the choice of lines and equipment selection;
③, safe electricity measures;
④, the construction site to prevent electrical fire measures.
2, site fire safety control points
①, the development of fire safety system, the establishment of fire responsibility system - "who is responsible, who is responsible for", "who is in the post, who is responsible";
②, with the fire, electricity system, to avoid the occurrence of fire;
③, the site in the forest, there must be specific, operable forest fire prevention measures;
④, check the fire equipment and fire safety signs set.
4, the main points of safety control within the enterprise
①, cars, loaders, digging machines and other motor vehicle drivers must be holders of certificates, to eliminate undocumented driving;
②, motor vehicle performance must be good, especially the vehicle brake and the direction of the system should be flexible and effective;
③, is not allowed to drink driving;
④, strictly control the speed and safety between the vehicle spacing, comity three first;
⑤, the vehicle can not be loaded outside the compartment, to avoid driving vibration fall hurt;
5, on-site machining safety control points
①, the development of mechanical processing safety procedures, hanging processing room, the common compliance;
②, check the power supply lines and lighting facilities to prevent electric shock accidents and fire accidents;
③, materials, finished products, semi-finished products stacked the overall order, the road smooth road;
④, mechanical operation part must have a protective cover and other safety devices;
⑤, ground (or zero protection) should be complete;
⑥, the hydraulic system must be leakproof, rain, to prevent the pressure spray atomization caused by fire;
6, site welding and cutting safety control points
A, welding:
①, welding machine should be placed in a dry, well-ventilated place, surrounded by non-flammable, explosive products;
②, mine, rain weather can not be in the open field welding operations;
③, is strictly prohibited in the pressure vessel and pipe welding, welding equipment must first cut off the power supply;
④, mobile welding machine should be cut off the power, check the scene, remove the slag;
⑤, high-altitude welding to fasten the seat belt;
B, gas welding:
①, oxygen bottles and acetylene oxygen bottles should not be placed in the same place, a variety of pressure gauge intact, is not allowed to grease pollution;
②, oxygen cylinders and acetylene oxygen bottles can not heat more than 35 ℃, the operation according to "open acetylene, first acetylene" in the order of operation;
③, oxygen cylinders and acetylene oxygen bottles installed outside the shock ring, tighten the helmets, to avoid collision and exposure;
④, tip or cut mouth can not be aimed at their own or others;
⑤, gas welding drums, etc. to be approved, and by special treatment, or prone to accidents.
Third, the professional type of safety supervision and control points
1, drainage trench excavation and protection works
①, high slope should be excavated layer of protection layer: First, anti-landslide, the second is to avoid increasing the height of the suspension, increase the construction risk;
②, slope protection scaffolding stand on the basis of hard, erected firm;
③, fixed on the scaffolding machinery and equipment must be solid, solid;
④, masonry protection: handling attention to non-slip, springboard to be stable, slope to meet the requirements of the program;
⑤, slope anchor bolt support according to the hole within the anchor anchor requirements;
2. Caisson and pipe jacking works
①, the safety of the caisson template support;
②, chisel in addition to concrete cushion and sand cushion, we should pay attention to symmetry, synchronization, uniform to prevent dumping;
③, caisson to prevent the tilt, rotation, not sink, sudden rise caused by security issues;
④, pipe jacking pipe support must be solid, solid;
⑤, the safety of pipe jacking, ventilation safety measures to meet the regulatory requirements;
⑥, pipe jacking to prevent the occurrence of iron collapse.

Teach you how to debug laser cutting machine precision

Laser cutting machine after a period of time, cutting accuracy will have some error, this error is often due to changes in the focal length caused. So, how to master the accuracy of the operation is necessary to operate laser cutting machine, the following Xiaobian to give you universal about.
Laser cutting machine precision debugging method:
1. When the spotlight of the focus laser is adjusted to the minimum, the initial effect is determined by the spotlight, and the focal length is determined by the size of the spot effect. We only have to look at the laser light to the minimum, so this position is the best Processing focal length, and then start processing work.
2. In the front part of the laser cutting machine debugging, we can use some of the test paper, the workpiece scrap to determine the accuracy of the location of the focal length, move the upper and lower laser head height position, the laser spot size will have different size changes. Repeatedly adjust the position to find a minimum of a spot position to determine the focal length and the best position of the laser head.
3. Laser cutting machine in the installation is completed, the cutting edge of the CNC cutting machine is equipped with a scribing device, through the crossed device to draw a simulation cutting graphics, simulation graphics for the 1m square. Built a diameter of 1m round, four corners were drawn diagonal, after the draw, with the measurement tool to measure the circle is not tangent with the square of the four sides. Square diagonal length is √2 (open root number of the data is about: 1.41m), the circle of the central axis should be bisected square side, and the central axis and the square side of the two points to the square of the intersection The distance should be 0.5m. Test the distance between the diagonal and the intersection, you can determine the cutting accuracy of the device.

  1   2   3     4     5  

Copyright © NINGBO AOLIAN WELDING&CUTTING MACHINERY INDUSTRY AND TRADE CO., LTD

Tel.: 0574-63077765         Fax: 0574-63077766
Add: No.98 Ma Tam Road,Hangzhou Bay New Area,CIXI, Ningbo, 315336, P.R.China